Customization: | Available |
---|---|
After-sales Service: | 24 Hours |
Warranty: | 6 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
3. Processing
4. Quality Control
1. Materials control: All the materials are purchased from the domestic brands or Eurpean twin-screw specialty materials suppliers,which tested by elemental analysis and metallurgical inspections to ensure the quality.
2. The internal splines is checked by the spline plug to ensure interchangeability of the elements
3. All components are machined by CNC machines to ensure the shapes and tolerances of the elements
4. Adopt the European high-speed steel powder processing technology,and do the treatment according to the strict heat treatment 4.process to ensure the wear and corrosion performance same as the foreigh brands.
5. Perfessioal technical team can not only provide timely and accurate mapping sample design but also the combination of elements of technical services.
6. There are various prepared technical information and the fitxtures for the various brands extruders to ensure the timely lead time.The common components have a lot of stock, even the new one, it can be delivered within 45days.
7. The modern management system can ensure the products 100% qualified and tracked.
5.Heat treatment
As we all know, heat treatment is very important in the screw production process. In order to ensure the quality of products, Joiner has purchased professional heat treatment equipment to produce, so that we can control the construction process by ourselves. In China, we are the only company that does heat treatment by ourselves, and the heat treatment of screw components made by Nanjing factory is processed by outsiders, so the quality of products can not be completely guarantee.
6. Production and Inspection of Equipment
Our factory is state-of-the art and spans over 20,000 square meters. The factory houses more than 130 sets of different domestic and foreign high precision production equipment, with the degree of numerical control up to 95%.
7. FRQ